Skip to content

Idea

The First Step of Our Production Process: Understanding Your Needs and Working on New Ideas. After we have fully determined your needs, we proceed to the design stage with innovative and original ideas. Thus, not only the product, but also completely original collections reflecting your brand emerge.

The Process of Preparing a Price Offer

After determining the product content, features and requested quantities, the most appropriate price offer is prepared in accordance with your requests. During the bidding process, all details are carefully evaluated and presented to you in the most transparent way.

Production

If the stock fabrics on the card are preferred, our production time is 3-4 weeks, and for special production fabrics, this period is 6-7 weeks. We have the opportunity to make fast production in ready-made fabrics in accordance with your needs.

Sample

The sample production time is between 7-10 days.Dec. Depending on the difficulty of the product, this period may last up to 2 weeks.

Design

According to the design or sample from you, a high-quality manufacturing sample is created. If you do not have any product images or samples, a design study is prepared entirely for you in the light of the information you provide.

Delivery

It takes between 2-3 days by air cargo and 7-10 days by road.Dec.

SEE ALSO

ENTER THE WORLD OF ZIRWE

Filter by

FABRIC
COLOR